An RFP's evaluation section describes how the buyer will compare responses: the criteria, the weight of each, the scoring scale, any pass marks, and how price is scored. Reading it before you write shows where the points are and which requirements feed which criterion. Terms and methods vary by country and buyer.

Updated 28 October 2026. General guidance, not legal advice: procurement rules differ by country and buyer, and the RFP's own instructions come first.

What the section usually contains

The evaluation section can be labelled evaluation criteria, evaluation methodology, award criteria or basis of award. In US federal solicitations that follow the Uniform Contract Format it is typically Section M, with the response instructions in Section L. It sits apart from the requirements, which is why teams that shred only the requirements miss it.

Buyers describe their approach in different terms: best value, lowest price technically acceptable, most advantageous tender, quality-price ratio. The names suggest the balance between quality and price, but the detail is in the weights and the scoring rules. This guide describes what to look for. It does not recommend a bidding strategy, and it is not legal advice.

Reading the section in six passes

  1. Find the method Is the award to the lowest price among compliant bids, or to the best weighted score across quality and price?
  2. List criteria and sub-criteria Note the names, the order and any ranking statement, such as listed in descending order of importance.
  3. Record the weights Percentages or points for each criterion, and whether sub-criteria carry their own.
  4. Read the scoring scale What each score means, for example 0 to 5 with 0 for no response, and any minimum a criterion must reach.
  5. Find the price rule How price turns into points: a formula, a comparison with the lowest price, or whole-life cost.
  6. Note the unwritten stages Presentations, demonstrations, interviews, references and site visits, and whether they are scored.

One price formula is commonly seen, and is shown here only as an illustration: the lowest compliant price earns full marks, and every other price earns the lowest price divided by its own, multiplied by the points available. With 30 points for price, a bid 20 percent above the lowest would earn 25 points. Check the formula in your own RFP, because buyers vary.

What to extract, and where it goes in the matrix

ElementWhat to look forWhere to record it
MethodLowest price, weighted score or best valueA note at the top of the matrix
Criteria and sub-criteriaNames, order and any ranking statementA Criterion column on each related row
WeightsPercent or points for each criterionA Weight column or a criteria sheet
Scoring scaleWhat each score means, such as 0 to 5The criteria sheet, shared with writers
Minimum thresholdsPass marks on a criterion or on the totalA flag on the criterion, treated as a gate
Price formulaHow price converts to pointsThe pricing owner's notes
Other stagesDemonstrations, presentations, referencesThe schedule, with owners

Add the Criterion and Weight columns to the matrix described in compliance matrix explained, and feed what you learn into the bid/no-bid checklist. Mandatory vs desirable requirements covers how pass marks and gates interact with scoring. The RFP vs RFQ vs RFI page shows how a tender's pass/fail gates sit beside its scored questions.

What goes wrong when reading the scoring section

  • Reading only the requirements. The evaluation section can carry obligations, such as page limits per criterion, and it shows where the points sit.
  • Equating weight with effort. A 10 percent criterion can need more work than a 30 percent one. Plan time by weight and by difficulty.
  • Missing a minimum score. A high total can still fail if one criterion has a floor.
  • Assuming the scale. A 0 to 5 scale from another buyer does not tell you what a 3 means here.
  • Guessing weights. Best value does not tell you the split. If the RFP gives no weights, record that, and ask if it matters.
  • Leaving requirements unmapped. If a desirable row feeds no criterion, ask whether it will be scored at all.
  • Treating a scored demonstration as an afterthought. If presentations carry points, they need owners and dates in the plan.

How TenderMatrix helps

TenderMatrix does not read or apply weights and does not score responses. It gives you the rows to map: convert the RFP, add a Criterion column in the downloaded Excel file, and fill it from the evaluation section so that each Desirable and Question row points at the criterion it feeds. A weights table in the PDF is usually not read row by row, so copy the criteria and weights across by hand. Try it on the RFP to Excel page. Free: 1 file per day, up to 10 pages, no account. Files over 10 pages are converted up to page 10 on the free allowance; a page code converts the whole file, up to 150 pages. See pricing.

Questions bid teams ask

What are evaluation criteria in an RFP?

They are the factors the buyer uses to compare responses, such as technical approach, experience, delivery plan and price, usually with weights. They often sit in a section separate from the requirements.

Where is the evaluation section?

It may be called evaluation criteria, evaluation methodology, award criteria or basis of award. In US federal solicitations using the Uniform Contract Format it is typically Section M, with response instructions in Section L. Other buyers put it in the instructions to bidders.

Are weights always disclosed?

No. Some buyers publish exact weights, some give an order of importance, and some say only that price and quality will be considered. Record what is stated and do not guess the rest.

What is a minimum score threshold?

A pass mark on a criterion or on the total, below which a response may be rejected or not considered further, whatever its price. Plan for it like a mandatory requirement, and check how the RFP words it.

How is price usually scored?

Methods vary. Some buyers give the lowest compliant price full marks and score the others in proportion, some compare whole-life cost, and some treat price as a separate ranking step. Only the RFP's own formula counts.

Should I write more for higher-weighted criteria?

Weight shows where points are, but page limits and the quality of evidence matter too. Plan effort by weight, difficulty and gaps, and keep to the stated format.

Do I need to restate the criteria in my response?

Only if the instructions ask. Many buyers expect the response to follow the order and headings of the criteria or requirements. Check the response instructions for the required structure.